My Friend's Projects Started.
|
12-23-2009, 07:34 PM
Post: #51
|
|||
|
|||
My Friend's Projects Started.
Parts renewal time
We start with engine heater Body would unscrew. To remove the engine before removing the propeller are. After removing the five screws that are Bottom we have already removed all the parts Top row came to disassemble |
|||
12-23-2009, 07:50 PM
Post: #52
|
|||
|
|||
My Friend's Projects Started.
Heating from inside the engine shit
Plastic parts are destroyed time to pass free of metal parts During primer and paint Parts assembly time! Fan motors are starting to collect, coils, and then we sat down, ready to be attached to the body are.. Second stage of the window and window installation is complete Now at the top, window mechanism, electric installations, metal tray and finish the installation done |
|||
12-23-2009, 07:52 PM
Post: #53
|
|||
|
|||
My Friend's Projects Started.
|
|||
12-23-2009, 09:23 PM
Post: #54
|
|||
|
|||
My Friend's Projects Started.
nice, nice! i wonder if i can do the same with mine.
|
|||
12-24-2009, 05:01 PM
Post: #55
|
|||
|
|||
My Friend's Projects Started.
Nice work!
1985 AE86 (ハチロク) Levin - Summer time daily driver |
|||
12-24-2009, 08:42 PM
Post: #56
|
|||
|
|||
My Friend's Projects Started.
Thanks my firends,radiator fan is on the menu today
Not saying more dirt Screws and clips are removed To remove the radiator fan of the types and status could come after mug deplorable and anywhere in the leaked previously been treated in Upper body at the bottom are dedicating so much shit we saw really stood in the stomach if you are doing The windows will be removed in the foam have survived already pas |
|||
12-24-2009, 08:48 PM
Post: #57
|
|||
|
|||
My Friend's Projects Started.
To remove the windows are removed first arm
Washing polishing by sanding triple hi the consistency of most shiny as pure can come back to life when you're happy Primers at a more hair to prevent corrosion of metals are paint time |
|||
12-24-2009, 09:00 PM
Post: #58
|
|||
|
|||
My Friend's Projects Started.
we do not like the first clear mastery of the painter a painter to deal with, we resumed operations room
Completed our radiator replace worn-out life is our custom radiator is sparkling new Instead we tried to install a new radiator but did not enter because of corners would dive with Monster enters instead of the end well done We are where we paint finishes by making stone Came to the sponges during the renewal process. 0.8 to 1.0 for windows milimi other places I decided to use a sponge milimi research is needed after a long bonding with the best results took derby Sponge start working from our acid baths rusty metal we send a lot. foam coating process, and we finish late |
|||
12-24-2009, 09:05 PM
Post: #59
|
|||
|
|||
My Friend's Projects Started.
We start with our assembly, our wheels into place and then, and radiator caps are finished installing the main
Provides the movement of arms and cover wire tension with this part of the plug and we finish our job. The top, and we renewed our sponges are finished. Rusted metal out of our acid bath after the scan with wire brush are ready for paint. Dirt and rust from metal-free and our fans, our radiators. |
|||
12-27-2009, 06:14 PM
Post: #60
|
|||
|
|||
My Friend's Projects Started.
Nice work man
Toyota Sprinter Trueno 4AG Engine... |
|||
« Next Oldest | Next Newest »
|
Possibly Related Threads... | |||||
Thread | Author | Replies | Views | Last Post | |
ZaX's new projects | ZaX | 6 | 2,735 |
01-21-2023 07:23 PM Last Post: ZaX |
|
ZDoman's projects - Hungary | ZDoman | 185 | 179,525 |
10-14-2015 06:27 PM Last Post: BOOMEX |
|
My Project has started... | Rasteirinho | 195 | 200,011 |
02-08-2015 05:35 PM Last Post: Rasteirinho |
|
Foto from ROTACHI projects 2009 | jardapek | 3 | 5,764 |
11-17-2008 11:02 PM Last Post: jardapek |
|
Projects section rules | banpei | 2 | 38,465 |
02-18-2005 11:24 AM Last Post: banpei |
User(s) browsing this thread: 12 Guest(s)