Kida AE86 project finally under way [20V pwrd]
Okaaay, finally the engine is running properly and i can open a proper thread for it. The blacktop's been having an anomalous bogdown issue which was finally solved with a complete rerun of the vacuum hosing and it's now running better and getting used to the new setup. It took it about 2 weeks to go from its initial maps with the proper vacuum setup to the new ones with the major vacuum leak, let's hope it's going to be quicker about remapping itself this time =)
pics of the car as it was when it arrived: interior shot after the insides were taken out for cleaning: some more exteriour shots on the day of the cleaning: Trying to sort the timing which was 10 degrees too advanced according to manual-stock-spec, i had to reach through the passenger compt. to reach the dizzy hold-down bolt since it was inaccessible from the engine bay: Parts taken out and off into the garage: More parts around and on the bench, for once used as a bench indeed =) One of the biggest headaches - working through the wiring loom: |
|||
« Next Oldest | Next Newest »
|
Messages In This Thread |
Kida AE86 project finally under way [20V pwrd] - domi - 04-09-2007 03:17 AM
|
Possibly Related Threads... | |||||
Thread | Author | Replies | Views | Last Post | |
Krullibulls Ae86 BEAMS is the only way | krullibull | 86 | 90,182 |
05-07-2019 09:35 PM Last Post: banpei |
|
Its in Finally | Alex170984 | 3 | 5,785 |
07-16-2013 04:01 PM Last Post: Alex170984 |
|
AE86 From Down under.New pics Pg5 | 20vPETE | 143 | 130,753 |
01-14-2013 01:17 PM Last Post: Eircamae86 |
|
My 20v booter project | diggerdolan | 2 | 5,484 |
10-01-2012 04:45 PM Last Post: zenki |
|
86er's Track rebuild N2.??? Finally an update page 8 | 86er | 191 | 260,277 |
03-25-2012 10:05 AM Last Post: bozu |
User(s) browsing this thread: 5 Guest(s)